Appraise property
Real estate

Apartment renovation: what requires a permit, what doesn't, and how to legalize what's already done

29-04-2026 / Regent Zagreb
Apartment renovation: what requires a permit, what doesn't, and how to legalize what's already done

Apartment renovation is one of the most common real estate interventions — whether you want to modernize the space, increase functionality, or boost market value.

However, before you start, it is crucial to understand what you can do without a permit, when you need a project, and in which cases you will enter a more serious administrative procedure.
To help you navigate this, we offer a practical guide through three levels of intervention: works without a permit, works requiring a project, and interventions for which a building permit is necessary.

No Permit Zone: What You Can Do Immediately

The good news is that a large portion of renovations do not require a building permit. According to current regulations, certain works are classified as simple interventions.
However, it is important to emphasize — the fact that a permit is not required does not mean there are no obligations.
In some cases, owner or building manager consent may be required, especially when dealing with common areas.

This category most commonly includes:

  • painting walls and ceilings, and decorative work
  • replacing floor coverings (parquet, laminate, tiles) without structural intervention
  • replacing interior doors
  • replacing sanitary ware (toilet, sink, shower, bathtub) without changing the installation system
  • minor repairs to electrical and plumbing installations
  • replacing radiators of the same type and power


Special attention should be paid to:

Replacing windows and exterior carpentry — although permitted if opening dimensions are not changed, in multi-apartment buildings, the facade appearance must be respected, and manager or owner consent is often required.

Key rule: you can change elements, but you must not interfere with the structure or change the system.

Works Without a Permit, but With a Mandatory Project

There is a common misconception that works not requiring a building permit do not require any professional documentation. In practice, this is not true.

Certain interventions require the preparation of a main project by an authorized architect or engineer.

This category includes:

  • Demolition of non-load-bearing walls
  • Removal of partition walls to create open-space areas generally does not require a building permit.
  • However, it is very important to first determine if it is indeed a non-load-bearing wall — which often requires expert assessment or a project.
  • Complete replacement of installations


If:

  • you are changing the layout of electrical installations
  • you are moving plumbing or drainage connections
  • you are creating a new kitchen or bathroom in a different location


— then we are no longer talking about "minor repairs," but an intervention that requires project documentation.

Structural Interventions (With Project)

Creating openings in load-bearing walls or any intervention that could affect the building's stability requires the involvement of an authorized professional.

In practice:

  • a main project is required
  • owner consent is often needed
  • in certain cases, a building permit may also be required


This is where mistakes are most often made — and where the consequences are most costly.

Works Requiring a Building Permit

For certain interventions, there is no room for interpretation — a building permit is mandatory.

This includes:

Interventions on the load-bearing structure (demolition of load-bearing walls)

  • interventions on columns, beams, or floor structures
  • Change of use of space (conversion of commercial space into an apartment or apartment into commercial space) ; Such changes require harmonization with the spatial plan and new documentation.
  • Subdivision and division of an apartment


Dividing one property into multiple separate units includes:

  • project
  • owner consent
  • registration in the land registry


Increasing the area

  • enclosing a loggia
  • adding a balcony
  • expanding living space


Any increase in gross area requires a building permit.

What if the works have already been done without a permit?

This is a common situation — especially with older renovations.

It is important to know that the classic legalization that once existed in Croatia is no longer open for new applications.

Today, irregularities are resolved through:

  • creating a survey of the existing condition
  • preparing project documentation
  • attempting to harmonize with current regulations


In some cases:

  • it is possible to obtain the necessary permits retrospectively
  • in others — the intervention cannot be legalized


This directly affects:

  • selling the property
  • valuation
  • possibility of obtaining a loan


How to Avoid Problems: Practical Advice

To ensure a smooth renovation, it is important to think ahead:

  • Consult a professional before starting work — even when you think it's not necessary
  • Inform the manager and neighbors — especially in apartment buildings
  • Check if owner consent is required
  • Choose contractors who understand the legal framework
  • Document installations before covering walls


The biggest mistake owners make is not the renovation itself — but the assumption that everything is allowed as long as it is done "within the apartment."

A good renovation starts with good information

Apartment renovation can significantly increase quality of life and property value — but only if it is carried out in accordance with the law.

The line between what is permitted and what is problematic is often thin, and wrong decisions can result in additional costs, legal problems, or difficulties in selling.

If you are planning a renovation or are unsure about the condition of your property, a timely professional assessment can save you time, money, and stress.

Currently popular

Property image

Chosen by Regent / Real estate

Pre-emption Right in Croatian Real Estate: Who Has It, When It Arises and How It Affects Your Transaction?

The pre-emption right is one of the legal encumbrances that most often catches buyers and sellers off guard — not because it is rare, but because it is not always visible. This guide explains what the pre-emption right in Croatian property law is, which types exist, who holds it and what it means in practice for a real estate transaction in Croatia. What ...
Property image

Chosen by Regent / Real estate

Seal on the title deed: What it means and should you worry?

All you need to know about the seal on the land registry deed — what a Z-number is, why it appears, how long it lasts, and how to remove it. Tips for safely buying property in Croatia. The moment you spot a "seal" on the land registry deed You're reviewing the land registry excerpt before buying a property — and suddenly you notice a mark you don't ...
Property image

Chosen by Regent / Real estate

Sustainable Construction and the nZEB Standard: What Nearly Zero-Energy Buildings Are and Why They Matter for Your Investment?

A nearly zero-energy building (nZEB) is a building that uses an extremely small amount of primary energy — the total energy required to produce and deliver fuel or electricity — while covering the remainder from renewable sources. From 2026, nZEB is a legal obligation for all new construction in Croatia, and by 2030 the EU sets an even stricter standard: ...
Property image

Chosen by Regent / Real estate

A Guide to Tourist Zones in Croatia: What T1, T2, and T3 Designations Mean for Your Investment

T1, T2, and T3 Tourist Zones in Croatia: What Every Investor Needs to Know Land on the first row to the sea, a view of the Adriatic, a Mediterranean climate - it sounds perfect. But as soon as you look at the documentation, you encounter a designation that changes everything: tourist zone . For unsuspecting investors, this designation often goes ...